Together, the turbines achieve a total generating capacity of 51.25 MW.
Investment of £5 million committed to the area and up to 30 construction jobs
WindBOOST Control System to Be Installed on as Many as 800 GE Units.
New Zero Footprint Facility Employs Atrato High Density Disk Arrays to Increase Efficiency and Accelerate Performance of Its VMware Environment.
SSE (Scottish and Southern Energy) is to become the first utility in the UK to build and monitor its own development of zero carbon homes.
ETI announce plans to design world’s largest open access offshore wind turbine drive train test rig.
The new factory, a 4000 m2 facility, is expected to be completed in the third quarter of 2010.
Now, the invention, which has been called CRTEF (Controllable Rubber Trailing Edge Flap), has been tested in a wind tunnel with promising results.
A-Power completed the establishment of a project company related to the development of a 600MW wind farm in Texas.
MM92 turbines with a hub height of 88.5 meters and 2 megawatts (MW) of rated power to be supplied.

