of 21 Gamesa G87-2.0 MW turbines for the Dunas de Paracuru wind farm
Gamesa strengthens its presence in Brazil with its second contract in two months: a new order for wind turbines with combined capacity of 42 MW A total of 21 Gamesa G87-2.0 MW turbines for the Dunas de Paracuru…