About this project.
Siemens Gamesa will deliver 15 MW turbines for the 750 MW Bandibuli (Firefly) floating offshore wind project in South Korea, with plans for nacelles to be assembled locally as part of an agreement. Doosan Enerbility has signed a…
This Project Atlas record was created from World of Renewables intelligence coverage and is continuously enriched as related reporting is indexed.
Organisations connected to this project.
Project relationships are linked directly into the WoREA Buyers Guide so users can move between assets, suppliers and company intelligence.
1 linked WoREA report.
Historic and current World of Renewables coverage connected to this project record.
Equinor’s South Korean Floating Wind Farm to Feature Siemens Gamesa 15 MW Turbines
Siemens Gamesa will deliver 15 MW turbines for the 750 MW Bandibuli (Firefly) floating offshore wind project in South Korea, with plans for nacelles…
Read linked reportTrack the project, not just the headline.
Switch project alerts on and WoREA will notify you when new linked coverage or material Project Atlas updates are published. You can turn alerts off at any time from My WoREA.