About this project.
French utility EDF has abandoned its plan to convert its 1.2 GW Cordemais 2 coal-fired plant to biomass, with plans to cease power production by 2027, reported Montel.France's CGT energy union said EDF CEO Luc Remont had previously…
This Project Atlas record was created from World of Renewables intelligence coverage and is continuously enriched as related reporting is indexed.
1 linked WoREA report.
Historic and current World of Renewables coverage connected to this project record.
EDF abandons Cordemais biomass plant
French utility EDF has abandoned its plan to convert its 1.2 GW Cordemais 2 coal-fired plant to biomass, with plans to cease power production…
Read linked reportTrack the project, not just the headline.
Switch project alerts on and WoREA will notify you when new linked coverage or material Project Atlas updates are published. You can turn alerts off at any time from My WoREA.