has been supplied for the solar farm
IdeemaTec puts 7.8 MW project into operation with 3.7 MW tracking system near Kehlheim.Wallerfing, 20 May 2014 - 3.7 MW of the horizontal tracking system, safeTrack Horizon, has been supplied for the solar farm in the area of…