inter-array cables and secondary steel for the 800 MW OranjeWind offshore wind farm
DEME has been awarded a contract to carry out the transport and installation of inter-array cables and secondary steel for the 800 MW OranjeWind offshore wind farm in the Netherlands. Scheduled to start in the second half of…