3.8 C
London
Saturday, November 27, 2021
Energy Transition North America 2021

Western Renewable Energy (WRE) Case Study – River Dart Country Park

Popular Articles

Large scale micro-hydro installation

Site: Ashburton, Devon

Turbine: Archimedes screw

Power: 50kW

Head: 4.5m

Western Renewable Energy (WRE) was brought in by the site owner to carry out the feasibility work and design. WRE negotiated the consent to allow the machine to be installed pending a large fish testing programme.

Please see full Case Study:  CLICK HERE

 

 

- Advertisement -Energy Transition North America 2021

More articles

Latest articles

- Advertisement -