Skip to content
WORLD OF RENEWABLES Connecting a cleaner, brighter tomorrow

Western Renewable Energy (WRE) Case Study – River Dart Country Park

July 21, 2014 · WoREA Editorial Team · World of Renewables

Large scale micro-hydro installation

Site: Ashburton, Devon

Turbine: Archimedes screw

Power: 50kW

Head: 4.5m

Western Renewable Energy (WRE) was brought in by the site owner to carry out the feasibility work and design. WRE negotiated the consent to allow the machine to be installed pending a large fish testing programme.

Please see full Case Study:  CLICK HERE