Article Top AdTop of article ad here
DONG Energy has conducted a competitive tender for the supply of turbines, with Vestas Wind Systems chosen as the preferred supplier with a proposal to deliver the V164-8.0 MW turbine for the Burbo Bank Extension Offshore Wind Farm
You must log in to post a comment.