Skip to content
WORLD OF RENEWABLES Connecting a cleaner, brighter tomorrow
Wind EnergyDevelopment1 linked reports

OPDE starts up innovative Control Centre to manage solar farm

Monitors more than 7,000 trackers and 21,000 solar photovoltaic solar farm inverters which obtain some 73 MW of power. Based at the RÍOS Company, part of the OPDE group, in Fustiñana (Navarra) and on a 7-day per week…

Project overview

About this project.

Monitors more than 7,000 trackers and 21,000 solar photovoltaic solar farm inverters which obtain some 73 MW of power. Based at the RÍOS Company, part of the OPDE group, in Fustiñana (Navarra) and on a 7-day per week…

This Project Atlas record was created from World of Renewables intelligence coverage and is continuously enriched as related reporting is indexed.

Project intelligence timeline

1 linked WoREA report.

Historic and current World of Renewables coverage connected to this project record.

My WoREA

Track the project, not just the headline.

Switch project alerts on and WoREA will notify you when new linked coverage or material Project Atlas updates are published. You can turn alerts off at any time from My WoREA.

My WoREA projects
Project intelligence

Connect every update to the people who care about it.

WoREA links projects to companies, historic reporting and member watchlists. Claim or manage the project to keep its data current across the network.

Claim a projectJoin WoREA