By Robin Sayles
Précis:
Solar thermal news you need to know.
Morocco invites bids for two CSP plants at Noor Midelt
Sponsors
Sponsors
The Moroccan Agency for Solar Energy (MASEN) has invited pre-qualifications for the design, financing, construction and operation of Noor Midelt Phase I, consisting of two hybrid PV-CSP projects each of CSP gross capacity 150 MW-190 MW.
The CSP technology must be a synthetic oil parabolic trough with storage or a molten salt tower with storage and developers have until October 14 to make their bids, official documents show.
Image:
Premium`:
No
Read more here:: http://social.csptoday.com/markets/morocco-tenders-380-mw-csp-capacity-europe-claims-hybrid-plant-breakthrough









