About this project.
SMEC has been awarded a contract for feasibility studies of a pumped storage addition to the Magat Hydroelectric Project (an existing 360MW hydropower scheme) on the island of Luzon in the Philippines. The project is being undertaken by…
This Project Atlas record was created from World of Renewables intelligence coverage and is continuously enriched as related reporting is indexed.
Organisations connected to this project.
Project relationships are linked directly into the WoREA Buyers Guide so users can move between assets, suppliers and company intelligence.
1 linked WoREA report.
Historic and current World of Renewables coverage connected to this project record.
SMEC wins Hydropower Project in the Philippines
SMEC has been awarded a contract for feasibility studies of a pumped storage addition to the Magat Hydroelectric Project (an existing 360MW hydropower scheme)…
Read linked reportTrack the project, not just the headline.
Switch project alerts on and WoREA will notify you when new linked coverage or material Project Atlas updates are published. You can turn alerts off at any time from My WoREA.