Author:
Egypt is aiming to become a leading producer of green hydrogen, targeting 8 percent of the global market share by 2040, according to the head of the country’s top investment body. This ambition is supported by several large-scale projects awarded in recent months, with more expected in the coming years, reported Zawya. As per the media report, Husam Haiba, CEO of the General Authority for Investment[1] and Free Zones (GAFI), noted that Japan is anticipated to play a significant role in financing these projects. Haiba made these remarks on Tuesday following a meeting with a delegation from the Japan Bank…
Rajputana Biodiesel, a producer of biofuels and its by-products glycerine and fatty acids, is set to launch an initial public offering (IPO) on November 26 to raise Rs 24.7 crore. The company has set a price band of Rs 123-130 per share for the offer. The IPO, which will be entirely a fresh issue of 19 lakh equity shares, will close on November 28. The shares will be available for trading on the NSE Emerge from December 3. Retail investors can bid for a minimum of 1,000 shares, priced at Rs 1.3 lakh, which constitutes a single lot. The maximum…
[unable to retrieve full-text content] 200kg of hydrogen, supplied by Wales-based Compact Syngas Solutions, planned to power a 40-day sea trial early next year
Site is unlikely to be fully cleared before early next year the EA has previously said, after initially raising concerns funds from floods relief work would have to be redirected to the clear up by EWB Staff Adblock test (Why?)
[unable to retrieve full-text content] 395,000t/yr facility is currently due to be operational next year
Offshore wind developers are renewing interest in the Gulf of Mexico, with two companies submitting plans to the US Bureau of Ocean Energy Management (BOEM). by Robyn White Adblock test (Why?)
Ocean Winds has completed three years of development work and submitted applications for offshore planning consent to the Scottish Government’s Marine Directorate for the 2 GW Caledonia offshore wind farm in Scotland. Caledonia, located in the outer Moray Firth, was awarded[1] the site in 2022 as part of the Scottish government’s ScotWind process. The offshore wind farm will cover an area of 423 square kilometres, situated in waters ranging from 40 to 100 metres in depth. The project is planned to feature 140 wind turbines, each with a maximum capacity of 25 MW and a height of up to 355…
The Solar Energy Corporation of India Ltd (SECI), under the Ministry of New and Renewable Energy, has signed a Memorandum of Understanding (MoU) with H2Global Stiftung to establish a framework for promoting Green Hydrogen initiatives. The collaboration aims to enhance knowledge sharing on market-based mechanisms and foster cooperation between India and importing nations, contributing to the global development of the green hydrogen economy. The MoU was signed on November 19, 2024, by Shri Sanjay Sharma, Director (Solar) at SECI[1], and Dr. Susana Moreira, Executive Director of H2Global[2]. The ceremony was attended by prominent figures, including Mr. Timo Bollerhey, CEO of…
Renewable energy consultancy OWC has been selected by Japanese industrial and engineering company, Kanadevia Corporation, to provide preliminary front-end engineering design (pre-FEED) services for a 15 MW semi-submersible floating wind project offshore Japan. OWC has supported Kanadevia since the initial stages of the floating offshore wind project, having collaborated during the Green Innovation Fund Phase 1, which involved basic design services several times. OWC’s role will focus on the first of several planned design iterations, with opportunities for the company to continue its support as the project progresses through its demonstration phases, said OWC. The floating offshore wind technology will…
Archer Wind has started the fabrication of the foundation which will be installed as part of the Culzean floating offshore wind pilot project. This single-turbine, 3 MW pilot project, owned and developed by TotalEnergies, will provide power to the Culzean gas platform in the UK North Sea. According to Archer Wind’s recent social media post[1], the first plate was cut on 19 November – a moment that signifies the transition from planning and design to tangible progress. Source: Archer Wind via LinkedIn In August, TotalEnergies awarded[2] Archer Wind a contract to deliver the floating foundation for the 3 MW wind…
We love our members. And they love us.
Join our Mailing List or Become a Member FREE
Don’t miss our future updates! Subscribe to our award winning e-Newsletters.
© 2024 World of Renewables. All rights reserved.
Transforming the future with sustainable energy solutions. Powered by innovation. Driven by sustainability.