Author: info@exergy.it
The project will deliver 28 MWe through a brine recovery ORC unit to ramp up the capacity of the existing steam power plant
• Located in Cornwall, at the United Downs site, the power plant will start producing 3 MWe by late 2024 to deliver renewable baseload power to help meet local net-zero targets.
• This new order raises the Exergy portfolio to over 500 MWe total capacity and consolidates its position as the second leading geothermal binary system provider worldwide.
We love our members. And they love us.
Join our Mailing List or Become a Member FREE
Don’t miss our future updates! Subscribe to our award winning e-Newsletters.
© 2024 World of Renewables. All rights reserved.
Transforming the future with sustainable energy solutions. Powered by innovation. Driven by sustainability.