Site icon World of Renewables – Home of The World Renewable Energy Association (WoREA)

‘World’s First’ In-Situ Generator Swap on Floating Wind Turbine Completed Offshore Scotland

‘World’s First’ In Situ Generator Swap on Floating Wind Turbine Completed Offshore Scotland

‘World’s First’ In Situ Generator Swap on Floating Wind Turbine Completed Offshore Scotland

A generator on a turbine at the Kincardine floating wind farm off the coast of Scotland has been replaced, in what is being claimed as the “world’s first” in-situ major component exchange at a floating offshore wind farm.

The work on the Vestas V164-9.5 MW wind turbine was carried out using an offshore support vessel (OSV) without the need to tow the unit back to a port, and was supported by crew transfer vessels (CTVs).

Several companies were included in the process, including LiftOff, Vestas, Kincardine owner Dragados S.A., and Cobra Wind International.

“By pushing the boundaries of innovation and embracing the requirement to improve previous processes, we have achieved a world-first technical solution that redefines the future for the renewables industry”, said José Polimón Olabarrieta, General Manager at Kincardine Offshore Windfarm Limited (KOWL).

To perform the process, a GenHook up-tower crane, supplied by the Netherlands-based LiftOff, was temporarily installed atop the Vestas turbine.

After Vestas prepared the wind turbine generator and decommissioned the old one, LifOff lifted it from the nacelle and lowered it to the deck of the floater, where it was then transferred to the OSV.

Using the same methodology, the replacement generator was then transferred to the floater and lifted into the nacelle using the GenHook crane.

This content is available after accepting the cookies.


View on Youtube.[1]

“This innovative in-situ solution, using an up-tower crane on a geared Vestas turbine, showcases that alternative means to towing activities are no longer just possible on paper or in animations, but a proven solution. This can pave the way to viable improvements in feasibility of floating wind projects around the world and should encourage the industry to continue its innovative approach”, said Thore Abel, Vestas director for global service contracting.

Located 15 kilometres off the coast of Aberdeen, the 50 MW Kincardine floating offshore wind farm consists of five Vestas V164-9.5 MW and one V80-2 MW turbine, each installed on WindFloat semi-submersible platforms designed by Principle Power.

Positioned in water depths ranging from 60 metres to 80 metres, these turbines have been successfully generating clean energy since October 2021.

ADVERTISE ON OFFSHOREWIND.BIZ

Get in front of your target audience in one move! OffshoreWIND.biz is read by thousands of offshore wind professionals daily.

Follow offshoreWIND.biz on:

References

^ View on Youtube. (www.youtube.com)

Adblock test (Why?)

Share your industry press now!

Are you a PR agency or sustainability-focused organization? Join the World of Renewables network FREE today and gain exclusive access to our platform to promote your business, share the latest industry news, and connect with a global audience of 700,000+ renewable energy professionals.

Register Now to start posting your updates and showcase your expertise to a highly engaged, environmentally-conscious community.

Find out more about our Content Partnership Programs.

*2024 AWARD WINNER* Websites & Mobile Sites, Webby Winner, Peoples Voice 2024


Exit mobile version