CALGARY, ALBERTA–(Marketwired – Sept. 16, 2015) – The Alberta Energy Regulator (AER) has approved the resumption of operations for 10 production pipelines at Nexen Energy ULC’s Long Lake oil sands operations.
Read more here:: http://www.marketwired.com/mw/release.do?id=2056190&sourceType=3